AFI Planning and Implementation Regional Group (APIRG)

Nineteenth Meeting of the Africa-Indian Ocean (AFI) Planning and Implementation Regional Group (APIRG/19)

(Dakar, Senegal, 28-31 October 2013) 

/

Dix-neuvième réunion du groupe régional AFI de planification et de mise en oeuvre (APIRG/19)

(Dakar, Sénégal, 28-31 Octobre 2013)

 

 

DOCUMENTATION

 

Document

Language

Invitation Letter / Lettre d'invitation (pdf)
Change of Dates / Changement de dates
Registration Form / Formulaire d'enregistrement (Word)
Information Bulletin / Bulletin d'information
Attachment A1 : Tentative Agenda / Pièce jointe A1 : Ordre du jour provisoire
Attachment A2 : Explanatory Notes on the Tentative Agenda /
Pièce jointe A2 : Notes explicatives sur le projet d’ordre du jour

Final Report

APPENDICES

Appendix 30A : AFI Air  Navigation  System Implementation Action Plan for the Africa-Indian  Ocean (AFI) Region – Version 1.0/ Plan d’action pour la Mise En œuvre du système de la navigation Aérienne dans la Région Afrique-Océan Indien (AFI) – Version 1.0 new

 
 
 
 
WORKING PAPERS / NOTES DE TRAVAIL
 
 

N° WP

AGENDA ITEM

Titre

Langue

WP/1 Provisional Agenda
WP/3 2 Review of Status of Implementation of APIRG/18 Conclusion and Decisions
WP/4 1 Status of implementation of other outstanding Conclusions and Decisions for Other APIRG previous Meetings
WP/5 2 Review of Conclusions and Decisions from RASG-AFI/01 Meeting
WP/7 2 Follow-up to Recommendations of the AN-Conf/12 / Suivi des Recommandations de la AN-Conf/12
WP/8 2 A Comprehensive Strategy for Air Navigation Revised Global Air Navigation Plan / Stratégie complète pour le plan mondial révisé de navigation aérienne
WP/9 3 Regional and Global Air Navigation Reporting /
Système de compte rendu régional et mondial de la navigation aérienne
WP/10 3.0 Regional Priorities and Targets for Air Navigation / Priorités et cibles régionales pour la navigation aérienne
WP/11 3.0 The Evolution of Electronic Tools and Data: A Strategy Plan for the Creation of a Community-Driven Decision-Support Digital Environment for the Global Aviation Community
WP/12 3.0 Development of AFI ANS Implementation Action Plan with the ICAO ASBU
Appendix: Draft AFI ANS Implementation Action Plan
WP/13 3.1

Review of the Report of the AOP/SG/10 / Examen du rapport du AOP/SG/10

WP/14

3.2 The outcome of the 13th Meeting of the ATM/AIM/SAR Sub-Group
Appendix A: Consolidated Con & Dec FNL
Appendix B: ASCAA WG ToR
Appendix C: AFI RVSM Safety Policy
Appendix D: AARC Summary
Appendix E-1: ICG TOR
Appendix E-2: Areas of Routing ICG
Appendix F: Rev PRND WG TOR
Appendix G: ATSCSG ToR
Appendix H: AFI MET-ATM TF TOR
Appendix I: AFI ATM-MET TORs
Appendix J: AFI VACP
Appendix K: SAR Questionnaire
Appendix L: Updated SAR PFF
Appendix M: ASSI TF Revised TOR
Appendix N: SG TOR
WP/15 3.3 AFI RVSM Collision Risk Assessment No. 6
WP/16 A 3.4 Communications System Aeronautical Fixed & Mobile Services, Aeronautical Spectrum and General CNS Issues
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
WP/16 B 3.4 Report of the 5th Meeting of the CNS Sub-Group Communications Systems
WP/16 C 3.4 CNS Navigation Systems
WP/16 D 3.4 CNS Surveillance Systems
WP/17 3.5 Review of the Report of ATM/AIM/SAR/SG/13 / Examen du rapport du ATM/AIM/SAR/SG/13
Appendix A: Follow-up on APIRG/17 & 18 in the AIM Field
Appendix B1-B9: AIM Tables
Appendix C1-C3: Air Navigation Report Form - ASBU Methodology
Appendix D: Follow-up on APIRG/17 Conclusion 17/86 (AIM)
Appendix E: ASECNA Centralised Database
Appendix F: AIS/AIM System in South Africa
Appendix G: 21 Steps of the ICAO Roadmap: AIS to AIM transition
Appendix H: AIS-AIM related Deficiencies anticipated
Appendix I: AFI WG for the implementation of Recommandation 3/8C

WP/18

3.6 Aeronautical MET / Météorologie Aéronautique
Appendix A - Conclusions-Decisions-Review
Appendix B - SIGMET GUIDE Amendment 3
Appendix C - Manuel AMBEX
Appendix D - AFI OPMET Data Catalogue
Appendix E - Deficiencies in the MET Field
Appendix F - Challenge Facing AFI-MET
Appendix G - Future Work Programme MET/SG
WP/19 4 Review & Update of the List of deficiencies in the Air navigation Fields
Appendix A
WP/20 3.0 Review of the Report of the Seventh Meeting of the AFI Traffic Forecasting Group
WP/22 3.7

"Most Capable Best Served” Airspace Operations /

Concept (Mieux équipé, mieux servi) lors de l’exploitation de l’espace aérien

WP/24 3.7

Benefits of Aviation and need for Consultation Process with Users /

Avantages de l’aviation et nécessité du processus de consultation des usagers

WP/25 3.2 Status of AFI Flight Procedure Programme (AFI-FPP) Implementation / Etat d'Avancement de la mise en route du Programme de Procédures de Vol pour la Région AFI (AFI-FPP)
WP/26 3.4 Progress Report on NAVISAT Middle East & Africa Project
Appendix - Certification Study, Phase 2
WP/27 5 Impact of Implementation of the ICAO ASBU Methodology on Regional Work Programmes

 

 

INFORMATION PAPERS / NOTES D'INFORMATION

Titre

Langue

IP/2 - List of Working Papers
IP/3 - Tentative Work Programme
IP/5 - REVIEW OF THE ACTIONS OF THE AIR NAVIGATION COMMISSION
IP/6 - RUNWAY SAFETY PROGRAMMES
IP/7- AFI INTEGRATED REGIONAL TELECOMMUNICATIONS INFRASTRUCTURE
IP/8 - GLOBAL OPERATIONAL DATA LINK DOCUMENT (GOLD)
IP/9 - PBN IMPLEMENTATION IN SOUTH AFRICA
IP/10 - MISSING FLIGHT PLANS
IP/11 - SMS QMS From Standards to Practice
IP/12 - AIS to AIM Transition Activities in ASECNA
IP/13 - ASECNA Implementation of language proficiency
IP/14 - France's Contribution to the AFI Procedure Programme (AFI-FPP)
Attachment to IP/14 / Attachement de IP/14
IP/15 - Satellite Air Navigation Services for African Region (SAFIR) Project
IP/16 - VHF/HF/CPDLC Survey, 08 - 29 July 2013
IP/17 - Progress on Alignment of RANPs with the GANP
IP/18 - Survey on missing Flight plans: August 2012 - August 2013
IP/19 - Outcome of CANSO CNS Subgroup
IP/20 - ASBUs

 

Connect with us: