Special Implementation Project (SIP) Workshop on preparation for AN-CONF/12 - ASBU Methodology

 

ICAO Special Implementation Project (SIP)
Workshop on preparation for AN-CONF/12 - ASBU Methodology
(Nairobi, Kenya, 13 - 17 August 2012)

 

 
DOCUMENTATION 
 
 
Invitation Letter​
Attachment A to State Letter 0300 ​​
​​Attachment B to State Letter 0300
​Registration Form
​Information Bulletin
​Performance report
​States Reports (zip file)
 
  
 
 
WORKING PAPERS 
 
​WP No. ​Title
​WP/1 Agenda​
WP/2​ ​List of documentation
​WP/3 Schedule​
​WP/4 Global ATM Operational Concept​
​WP/5 Performance Framework for Efficiency​
​WP/6 Aviation System Block Upgrade (ASBU) Methodology - An Overview​
​WP/7 Global Air Navigation Plan (GANP) - Framework for global planning​
​WP/8 ASBU Methodology Summary of Block 0 Modules​
​WP/9 ASBU Methodology Summary of Block 1 Modules​
​WP/10 ASBU Methodology Summary of Block 2 and 3 Modules​
​WP/11 Technology Roadmaps​
​WP/12 ANConf/12 - Agenda​
​WP/13 Airport Collaborative Decision Making (A-CDM)​
​WP/14 Eurocontrol presents The Airport CDM Project Collaborative Decision Making at Airports​
​WP/15 Dynamic wake turbulence separation​
​WP/16A Aviation System Block Upgrades. Module No BO-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance​
​WP/16B Aviation System Block Upgrades. Module No BO-70/PIA-1 Increased Runway Throughout through Wake Turbulence Separation​
​WP/16C Aviation System Block Upgrades. Module No BO-75/PIA-1 Safety and Efficiency of Surface Operations (A-SMGCS Level 1-2)​
​WP/16D Aviation System Block Upgrades. Module No BO-80/PIA-1 Improved Airport Operations through Airport-CDM
​WP/16E Aviation System Block Upgrades. Module No BO-15/PIA-1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)​
​WP/17 AIM - implementation
​WP/18 Integrated Meteorological Information
​WP/19 FF-ICE A Concept to Support the ATM System of the Future
​WP/20 System Wide Information Management
​WP/21A Aviation System Block Upgrades. Module No BO-25/PIA-2. Increased Interoperability, Efficiency and Capacity through Ground-Ground Integration
​WP/21B Aviation System Block Upgrades. Module No BO-30/PIA-2. Service Improvement through Digital Aeronautical Information Management
​WP/21C Aviation System Block Upgrades. Module No BO-105/PIA-2. Meteorological information supporting enhanced operational efficiency and safety
​WP/22 Collaborative Decision Making (CDM)
​WP/23 Remotely-Piloted Aircraft Systems
​WP/24A Aviation System Block Upgrades. Module No BO-10/PIA 3. Improved Operations through Enhanced En-Route Trajectories
​WP/24B Aviation System Block Upgrades. Module No BO-35/PIA 3. Improved Flow Performance through Planning based on a Network-Wide view
​WP/24C Aviation System Block Upgrades. Module No BO-84. Initial Capability for Ground-based Cooperative Surveillance
​WP/24D Aviation System Block Upgrades. Module No BO-85/PIA-3. Air Traffic Situational Awareness (ATSA)
​WP/24E Aviation System Block Upgrades. Module No BO-86/PIA-3. Improved Access to Optimum Flight Levels through Climb/Descent Procedures using ADS-B/td>
​WP/24F Aviation System Block Upgrades. Module No BO-101/PIA-3. ACAS Improvements
​WP/24G Aviation System Block Upgrades. Module No BO-101/PIA-3. Title
​WP/25 Trajectory-Based Operations (TBO)
​WP/26 Continuous Descent Operations (CDO)
​WP/27 Continuous Climb Operations (CCO)
​WP/28A Aviation System Block Upgrades. Module No BO-05/PIA-4. Improved Flexibility and Efficiency in Descent Profiles (CDOs)
​WP/28B Aviation System Block Upgrades. Module No BO-40/PIA-4. TitleImproved Safety and Efficiency through the initial application of Data Link En-Route
​WP/28C Aviation System Block Upgrades. Module No BO-20/PIA-4. Improved Flexibility and Efficiency in Departure Profiles
​WP/29 Measurement of environmental benefits
​WP/30 Regional Air Navigation Plan - Planning Methodologies and Tools
​WP/31 Economic issues Formulation of Business cases
​WP/32A Sample Template Aviation Navigation report Form (ANRF)
​WP/32B Hands-on Exercises Performance Based Planning and use of IFSET
​WP/33 Working Document for the Aviation System Block Upgrades
​WP/34 Appendix A:  Summary Table of Aviation System Block Upgrades Mapped to Performance Improvement Areas
 
 
 --------------------------------------------------------------------------------
 
 For further information please contact:

 

Connect with us: